Pr 22 EB over East Relief Channel
Fair Condition53 years old16,333 vehicles/day
Location
| State | Texas |
| County | Nueces |
| Location | 4.35 Mi E Of SH 358 |
| Carries | Pr 22 EB |
| Crosses | East Relief Channel |
| Coordinates | 27.63163, -97.23254 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 8 (Very Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 4 — Foundations need monitoring |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 240.2 ft (73.2 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 54.5 ft (16.6 m) |
| Deck Area | 1215.1 sq m |
| Main Spans | 6 |
| Year Built | 1973 (reconstructed 2004) |
Traffic
| Avg Daily Traffic | 16,333 (2023) |
| Truck Traffic | 6% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 161780061702028 |