NE Direct Conn over Us75 & Sh121 Connectors
Good Condition15 years old4,420 vehicles/day
Location
| State | Texas |
| County | Collin |
| Location | At Int US 75 & SH 121 |
| Carries | NE Direct Conn |
| Crosses | Us75 & Sh121 Connectors |
| Coordinates | 33.15402, -96.64662 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 2625.0 ft (800.1 m) |
| Max Span | 125.0 ft (38.1 m) |
| Deck Width | 27.9 ft (8.5 m) |
| Deck Area | 6800.9 sq m |
| Main Spans | 21 |
| Year Built | 2011 |
Traffic
| Avg Daily Traffic | 4,420 (2020) |
| Truck Traffic | 3% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 9 |
Inspection & Ownership
| Last Inspection | December 2023 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 180430036404615 |