El Dorado PKWY EB over Bnsf Railroad
Fair Condition22 years old15,138 vehicles/day
Location
| State | Texas |
| County | Collin |
| Location | 1.2 Mi W. Of Preston Road |
| Carries | El Dorado PKWY EB |
| Crosses | Bnsf Railroad |
| Coordinates | 33.17470, -96.82307 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 8 (Very Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 399.9 ft (121.9 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 50.5 ft (15.4 m) |
| Deck Area | 1877.3 sq m |
| Main Spans | 5 |
| Year Built | 2004 |
Traffic
| Avg Daily Traffic | 15,138 (2019) |
| Truck Traffic | 2% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 180430J00520002 |