US 75 NB over Campbell RD
Good Condition36 years old116,919 vehicles/day
Location
| State | Texas |
| County | Dallas |
| Location | 5.20 Mi NE Of IH 635 |
| Carries | US 75 NB |
| Crosses | Campbell RD |
| Coordinates | 32.97543, -96.71597 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 308.1 ft (93.9 m) |
| Max Span | 127.0 ft (38.7 m) |
| Deck Width | 85.0 ft (25.9 m) |
| Deck Area | 2432.0 sq m |
| Main Spans | 1 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 116,919 (2023) |
| Truck Traffic | 6% |
| Lanes On Bridge | 6 |
| Lanes Under Bridge | 10 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 180570004707288 |