Ih35e Nb/pgbt EB over Ih35e Nbfr&trinity Mills
Fair Condition25 years old10,889 vehicles/day
Location
| State | Texas |
| County | Dallas |
| Location | IH 35e/sh 190 Interchange |
| Carries | Ih35e Nb/pgbt EB |
| Crosses | Ih35e Nbfr&trinity Mills |
| Coordinates | 32.98187, -96.92833 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 1256.9 ft (383.1 m) |
| Max Span | 174.9 ft (53.3 m) |
| Deck Width | 38.1 ft (11.6 m) |
| Deck Area | 4444.0 sq m |
| Main Spans | 2 |
| Year Built | 2001 |
Traffic
| Avg Daily Traffic | 10,889 (2022) |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 6 |
Inspection & Ownership
| Last Inspection | 424 |
| Inspection Frequency | Every 24 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 180570019603452 |