Pgbt NB over Spur 303 / Pioneer PKWY
Good Condition14 years old7,729 vehicles/day
Location
| State | Texas |
| County | Dallas |
| Location | 2.35 Mi N Of IH 20 |
| Carries | Pgbt NB |
| Crosses | Spur 303 / Pioneer PKWY |
| Coordinates | 32.70992, -97.02456 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 243.1 ft (74.1 m) |
| Max Span | 125.0 ft (38.1 m) |
| Deck Width | 69.9 ft (21.3 m) |
| Deck Area | 1578.3 sq m |
| Main Spans | 1 |
| Year Built | 2012 |
Traffic
| Avg Daily Traffic | 7,729 (2015) |
| Truck Traffic | 5% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 12 |
Inspection & Ownership
| Last Inspection | 522 |
| Inspection Frequency | Every 48 months |
| Owner | Local Toll Authority |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 180570296401533 |