IH 30 EB over FM 1398 & Jones Creek
Good Condition61 years old18,228 vehicles/day
Location
| State | Texas |
| County | Bowie |
| Location | 1.80 Mi E Of FM 560 |
| Carries | IH 30 EB |
| Crosses | FM 1398 & Jones Creek |
| Coordinates | 33.47489, -94.25904 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 190.0 ft (57.9 m) |
| Max Span | 49.9 ft (15.2 m) |
| Deck Width | 41.7 ft (12.7 m) |
| Deck Area | 735.3 sq m |
| Main Spans | 4 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 18,228 (2023) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 190190061006104 |