SH 77 over Village Creek Relief

Good Condition57 years old818 vehicles/day

Location

StateTexas
CountyMorris
Location0.70 Mi E Of US 259
CarriesSH 77
CrossesVillage Creek Relief
Coordinates33.23490, -94.73264

Condition Ratings

Overall ConditionGood
Channel/Waterway6 (Satisfactory)
Culvert7 (Good)
Scour Critical7 — Countermeasures installed

Physical Characteristics

MaterialConcrete
DesignCulvert
Total Length65.0 ft (19.8 m)
Max Span9.8 ft (3 m)
Deck Area253.4 sq m
Main Spans6
Year Built1969

Traffic

Avg Daily Traffic818 (2022)
Truck Traffic23%
Lanes On Bridge2

Inspection & Ownership

Last Inspection724
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number191720027701016

Nearby Bridges