FM 2517 over Sabine River Relief

Good Condition66 years old2,533 vehicles/day

Location

StateTexas
CountyPanola
Location5.55 Mi E Of FM 699
CarriesFM 2517
CrossesSabine River Relief
Coordinates32.12781, -94.18547

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway8 (Very Good)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialConcrete
DesignStringer/Multi-beam
Total Length394.0 ft (120.1 m)
Max Span29.9 ft (9.1 m)
Deck Width45.9 ft (14 m)
Deck Area1681.4 sq m
Main Spans13
Year Built1960 (reconstructed 2009)

Traffic

Avg Daily Traffic2,533 (2021)
Truck Traffic10%
Lanes On Bridge2

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number191830223901004

Nearby Bridges