IH 30 EB over Tankersley Creek
Fair Condition61 years old18,804 vehicles/day
Location
| State | Texas |
| County | Titus |
| Location | 1.00 Mi W Of US 271 |
| Carries | IH 30 EB |
| Crosses | Tankersley Creek |
| Coordinates | 33.16488, -95.01499 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 131.9 ft (40.2 m) |
| Max Span | 44.0 ft (13.4 m) |
| Deck Width | 40.4 ft (12.3 m) |
| Deck Area | 494.5 sq m |
| Main Spans | 3 |
| Year Built | 1965 |
Traffic
| Avg Daily Traffic | 18,804 (2019) |
| Truck Traffic | 22% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 524 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 192250061003056 |