FM 562 over N Fork Double Bayou

Fair Condition72 years old1,326 vehicles/day

Location

StateTexas
CountyChambers
Location1.9 Mi S Of SH 65
CarriesFM 562
CrossesN Fork Double Bayou
Coordinates29.76103, -94.63348

Condition Ratings

Overall ConditionFair
Deck7 (Good)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway7 (Good)
Scour Critical7 — Countermeasures installed

Physical Characteristics

MaterialConcrete
DesignStringer/Multi-beam
Total Length29.9 ft (9.1 m)
Max Span29.9 ft (9.1 m)
Deck Width27.6 ft (8.4 m)
Deck Area76.4 sq m
Main Spans1
Year Built1954

Traffic

Avg Daily Traffic1,326 (2022)
Truck Traffic8%
Lanes On Bridge2

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 12 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number200360102201004

Nearby Bridges