SH 105 over Pine Island Bayou Relief

Good Condition29 years old10,350 vehicles/day

Location

StateTexas
CountyHardin
Location7.30 Mi E Of SH 326
CarriesSH 105
CrossesPine Island Bayou Relief
Coordinates30.13554, -94.28029

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway7 (Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length126.0 ft (38.4 m)
Max Span42.0 ft (12.8 m)
Deck Width86.0 ft (26.2 m)
Deck Area1006.1 sq m
Main Spans3
Year Built1997

Traffic

Avg Daily Traffic10,350 (2022)
Truck Traffic12%
Lanes On Bridge5

Inspection & Ownership

Last Inspection324
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number201010033904013

Nearby Bridges