SH 105 over Tarkington Bayou Relief
Fair Condition60 years old8,521 vehicles/day
Location
| State | Texas |
| County | Liberty |
| Location | 2.9 Mi SE Of US 59 |
| Carries | SH 105 |
| Crosses | Tarkington Bayou Relief |
| Coordinates | 30.32473, -95.04824 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 92.2 ft (28.1 m) |
| Max Span | 30.2 ft (9.2 m) |
| Deck Width | 65.3 ft (19.9 m) |
| Deck Area | 559.2 sq m |
| Main Spans | 3 |
| Year Built | 1966 (reconstructed 2017) |
Traffic
| Avg Daily Traffic | 8,521 (2022) |
| Truck Traffic | 16% |
| Lanes On Bridge | 3 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 201460059301009 |