US 77 over Hid #1 Drainage Ditch
Good Condition22 years old101,410 vehicles/day
Location
| State | Texas |
| County | Cameron |
| Location | 0.80 Mi NW Of FM 801 |
| Carries | US 77 |
| Crosses | Hid #1 Drainage Ditch |
| Coordinates | 26.16844, -97.69457 |
Condition Ratings
| Overall Condition | Good |
| Channel/Waterway | 7 (Good) |
| Culvert | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 24.0 ft (7.3 m) |
| Max Span | 9.8 ft (3 m) |
| Deck Area | 454.1 sq m |
| Main Spans | 2 |
| Year Built | 2004 |
Traffic
| Avg Daily Traffic | 101,410 (2023) |
| Truck Traffic | 8% |
| Lanes On Bridge | 13 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 210310003907325 |