FM 2556 over US 83
Good Condition57 years old3,816 vehicles/day
Location
| State | Texas |
| County | Cameron |
| Location | 1.50 Mi W Of FM 506 |
| Carries | FM 2556 |
| Crosses | US 83 |
| Coordinates | 26.16365, -97.84858 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 418.0 ft (127.4 m) |
| Max Span | 85.0 ft (25.9 m) |
| Deck Width | 42.3 ft (12.9 m) |
| Deck Area | 1643.5 sq m |
| Main Spans | 4 |
| Year Built | 1969 |
Traffic
| Avg Daily Traffic | 3,816 (2024) |
| Truck Traffic | 25% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 12 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 210310003919184 |