Us2/83eb To Us77sb over Dixieland RD & Tyler AVE

Good Condition55 years old25,575 vehicles/day

Location

StateTexas
CountyCameron
LocationUS 77/83 Interchange
CarriesUs2/83eb To Us77sb
CrossesDixieland RD & Tyler AVE
Coordinates26.18823, -97.71986

Condition Ratings

Overall ConditionGood
Deck7 (Good)
Superstructure7 (Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length1477.0 ft (450.2 m)
Max Span118.1 ft (36 m)
Deck Width44.3 ft (13.5 m)
Deck Area6077.7 sq m
Main Spans1
Year Built1971

Traffic

Avg Daily Traffic25,575 (2024)
Truck Traffic9%
Lanes On Bridge2
Lanes Under Bridge12

Inspection & Ownership

Last Inspection323
Inspection FrequencyEvery 48 months
OwnerState Highway Agency
Historical SignificanceBridge is possibly eligible (requires evaluation)
Structure Number210310003919204

Nearby Bridges