FM 3195 Stuart RD over Ccdd#5 Drain Ditch
Fair Condition23 years old14,701 vehicles/day
Location
| State | Texas |
| County | Cameron |
| Location | 0.4 Mi N Of US 83 |
| Carries | FM 3195 Stuart RD |
| Crosses | Ccdd#5 Drain Ditch |
| Coordinates | 26.18924, -97.75829 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 6 (Satisfactory) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 29.9 ft (9.1 m) |
| Max Span | 9.8 ft (3 m) |
| Deck Area | 222.0 sq m |
| Main Spans | 2 |
| Year Built | 2003 |
Traffic
| Avg Daily Traffic | 14,701 (2024) |
| Truck Traffic | 2% |
| Lanes On Bridge | 5 |
Inspection & Ownership
| Last Inspection | 724 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 210310330401001 |