New Combes RD over Ccwid#1 Main North Drain

Fair Condition26 years old796 vehicles/day

Location

StateTexas
CountyCameron
Location1.50 Mi S Of FM 508
CarriesNew Combes RD
CrossesCcwid#1 Main North Drain
Coordinates26.22643, -97.70574

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length60.0 ft (18.3 m)
Max Span60.0 ft (18.3 m)
Deck Width36.4 ft (11.1 m)
Deck Area203.1 sq m
Main Spans1
Year Built2000

Traffic

Avg Daily Traffic796 (2024)
Truck Traffic2%
Lanes On Bridge2

Inspection & Ownership

Last Inspection324
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number210310AA0153001