Palm Boulevard over Ccdd No. 5
Good Condition29 years old3,488 vehicles/day
Location
| State | Texas |
| County | Cameron |
| Location | 0.7 Mi S Of US 83 |
| Carries | Palm Boulevard |
| Crosses | Ccdd No. 5 |
| Coordinates | 26.17648, -97.74259 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 6 — Scour calculated, stable |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 60.7 ft (18.5 m) |
| Max Span | 29.9 ft (9.1 m) |
| Deck Width | 36.4 ft (11.1 m) |
| Deck Area | 205.3 sq m |
| Main Spans | 2 |
| Year Built | 1997 |
Traffic
| Avg Daily Traffic | 3,488 (2024) |
| Truck Traffic | 2% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 324 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 210310E00985001 |