Stewart Road over Edinburg Main Canal

Good Condition48 years old8,450 vehicles/day

Location

StateTexas
CountyHidalgo
Location0.2 Mi N Of FM 495
CarriesStewart Road
CrossesEdinburg Main Canal
Coordinates26.22970, -98.29901

Condition Ratings

Overall ConditionGood
Deck8 (Very Good)
Superstructure7 (Good)
Substructure7 (Good)
Channel/Waterway6 (Satisfactory)
Scour Critical5 — Stable for scour

Physical Characteristics

MaterialPrestressed Concrete
DesignBox Beam - Multiple
Total Length62.0 ft (18.9 m)
Max Span60.0 ft (18.3 m)
Deck Width70.9 ft (21.6 m)
Deck Area408.2 sq m
Main Spans1
Year Built1978 (reconstructed 2009)

Traffic

Avg Daily Traffic8,450 (2024)
Truck Traffic4%
Lanes On Bridge3

Inspection & Ownership

Last Inspection524
Inspection FrequencyEvery 24 months
OwnerCity/Municipal Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number211090M00765001

Nearby Bridges