IH 20 Bassett Exit over South Fork Leon River
Good Condition54 years old29 vehicles/day
Location
| State | Texas |
| County | Eastland |
| Location | 0.10 Mi N Of IH 20 |
| Carries | IH 20 Bassett Exit |
| Crosses | South Fork Leon River |
| Coordinates | 32.38283, -98.81641 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 200.1 ft (61 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 28.2 ft (8.6 m) |
| Deck Area | 524.6 sq m |
| Main Spans | 5 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 29 (2018) |
| Truck Traffic | 3% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is possibly eligible (requires evaluation) |
| Structure Number | 230680000703153 |