County Road over Faust Valley Wash

Fair Condition61 years old819 vehicles/day

Location

StateUtah
CountyBox Elder
LocationNo. Side Of Thiokol Plant
CarriesCounty Road
CrossesFaust Valley Wash
Coordinates41.71968, -112.42212

Condition Ratings

Overall ConditionFair
Channel/Waterway6 (Satisfactory)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialSteel
DesignCulvert
Total Length34.4 ft (10.5 m)
Max Span15.7 ft (4.8 m)
Deck Area86.1 sq m
Main Spans2
Year Built1965

Traffic

Avg Daily Traffic819 (2010)
Truck Traffic1%
Lanes On Bridge2

Inspection & Ownership

Last InspectionNovember 2023
Inspection FrequencyEvery 24 months
OwnerCounty Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number003010V