Snow Cyn. Parkway over Halfway Wash
Good Condition27 years old13,482 vehicles/day
Location
| State | Utah |
| County | Washington |
| Location | North Side Of St. George |
| Carries | Snow Cyn. Parkway |
| Crosses | Halfway Wash |
| Coordinates | 37.13342, -113.61178 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Concrete |
| Design | Frame |
| Total Length | 34.1 ft (10.4 m) |
| Max Span | 32.2 ft (9.8 m) |
| Deck Width | 129.9 ft (39.6 m) |
| Deck Area | 411.8 sq m |
| Main Spans | 1 |
| Year Built | 1999 |
Traffic
| Avg Daily Traffic | 13,482 (2010) |
| Truck Traffic | 10% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 224 |
| Inspection Frequency | Every 24 months |
| Owner | City/Municipal Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 053010D |