Camino Del Rio RD over North Creek

Fair Condition12 years old50 vehicles/day

Location

StateUtah
CountyWashington
LocationKoleb Rd. Oer North Creek
CarriesCamino Del Rio RD
CrossesNorth Creek
Coordinates37.20528, -113.17173

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure6 (Satisfactory)
Substructure6 (Satisfactory)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete
DesignSlab
Total Length89.9 ft (27.4 m)
Max Span38.7 ft (11.8 m)
Deck Width55.1 ft (16.8 m)
Deck Area460.3 sq m
Main Spans2
Year Built2014

Traffic

Avg Daily Traffic50 (2015)
Lanes On Bridge2

Inspection & Ownership

Last Inspection224
Inspection FrequencyEvery 24 months
OwnerTown/Township Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number053081D

Nearby Bridges