Us-40 (sr-40) over Halfway Hollow Wash

Fair Condition61 years old6,411 vehicles/day

Location

StateUtah
CountyUintah
Location11.5 Miles West Of Vernal
CarriesUs-40 (sr-40)
CrossesHalfway Hollow Wash
Coordinates40.32378, -109.68600

Condition Ratings

Overall ConditionFair
Channel/Waterway7 (Good)
Culvert6 (Satisfactory)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialConcrete Continuous
DesignCulvert
Total Length27.6 ft (8.4 m)
Max Span12.5 ft (3.8 m)
Deck Area92.4 sq m
Main Spans2
Year Built1965

Traffic

Avg Daily Traffic6,411 (2017)
Truck Traffic48%
Lanes On Bridge2

Inspection & Ownership

Last Inspection723
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0E1499

Nearby Bridges