Cemetery LN over I-15 NB & SB
Fair Condition52 years old500 vehicles/day
Location
| State | Utah |
| County | Juab |
| Location | 1 Mi.so.mona Interchange |
| Carries | Cemetery LN |
| Crosses | I-15 NB & SB |
| Coordinates | 39.80694, -111.83639 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 278.5 ft (84.9 m) |
| Max Span | 108.9 ft (33.2 m) |
| Deck Width | 32.2 ft (9.8 m) |
| Deck Area | 832.0 sq m |
| Main Spans | 4 |
| Year Built | 1974 |
Traffic
| Avg Daily Traffic | 500 (2012) |
| Truck Traffic | 1% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0F 325 |