Sr-9 over Coal Pit Wash

Fair Condition42 years old1,860 vehicles/day

Location

StateUtah
CountyWashington
Location6.8 Miles East Of Virgin
CarriesSr-9
CrossesCoal Pit Wash
Coordinates37.17079, -113.08321

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure7 (Good)
Substructure6 (Satisfactory)
Channel/Waterway8 (Very Good)
Scour Critical8 — Stable, low risk

Physical Characteristics

MaterialPrestressed Concrete
DesignStringer/Multi-beam
Total Length101.0 ft (30.8 m)
Max Span98.4 ft (30 m)
Deck Width45.9 ft (14 m)
Deck Area431.2 sq m
Main Spans1
Year Built1984

Traffic

Avg Daily Traffic1,860 (2014)
Truck Traffic21%
Lanes On Bridge2

Inspection & Ownership

Last Inspection125
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0F 485

Nearby Bridges