Sr-225 Park Lane over I-15 (sr-15)

Fair Condition22 years old6,346 vehicles/day

Location

StateUtah
CountyDavis
LocationFarmington Interchange
CarriesSr-225 Park Lane
CrossesI-15 (sr-15)
Coordinates40.98917, -111.90611

Condition Ratings

Overall ConditionFair
Deck6 (Satisfactory)
Superstructure8 (Very Good)
Substructure7 (Good)
Scour CriticalNot applicable

Physical Characteristics

MaterialPrestressed Concrete Continuous
DesignStringer/Multi-beam
Total Length367.8 ft (112.1 m)
Max Span138.8 ft (42.3 m)
Deck Width84.3 ft (25.7 m)
Deck Area2881.0 sq m
Main Spans3
Year Built2004

Traffic

Avg Daily Traffic6,346 (2022)
Truck Traffic16%
Lanes On Bridge4
Lanes Under Bridge15

Inspection & Ownership

Last Inspection623
Inspection FrequencyEvery 24 months
OwnerState Highway Agency
Historical SignificanceBridge is not eligible for the National Register
Structure Number0F 715

Nearby Bridges