I-15 (sr-15) Nbl over Sr-13 And Uprr
Fair Condition59 years old32,262 vehicles/day
Location
| State | Utah |
| County | Box Elder |
| Location | North Brigham Interchange |
| Carries | I-15 (sr-15) Nbl |
| Crosses | Sr-13 And Uprr |
| Coordinates | 41.53497, -112.06595 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 239.8 ft (73.1 m) |
| Max Span | 155.8 ft (47.5 m) |
| Deck Width | 34.4 ft (10.5 m) |
| Deck Area | 767.5 sq m |
| Main Spans | 3 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 32,262 (2017) |
| Truck Traffic | 31% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 523 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1C 334 |