Rp.i215nb To I80wb over I-215 I-80 & 4 Int.r
Fair Condition41 years old85,560 vehicles/day
Location
| State | Utah |
| County | Salt Lake |
| Location | I215-i80 Intchg.w.of Slc. |
| Carries | Rp.i215nb To I80wb |
| Crosses | I-215 I-80 & 4 Int.r |
| Coordinates | 40.76301, -111.95003 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 5 (Fair) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 1430.4 ft (436 m) |
| Max Span | 178.5 ft (54.4 m) |
| Deck Width | 29.9 ft (9.1 m) |
| Deck Area | 3967.6 sq m |
| Main Spans | 8 |
| Year Built | 1985 |
Traffic
| Avg Daily Traffic | 85,560 (2014) |
| Truck Traffic | 20% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 27 |
Inspection & Ownership
| Last Inspection | December 2022 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1C 700 |