I-15 (sr-15) Nbl over Co. Rd. Int. X-rd
Good Condition67 years old22,810 vehicles/day
Location
| State | Utah |
| County | Washington |
| Location | Pintura Interchange |
| Carries | I-15 (sr-15) Nbl |
| Crosses | Co. Rd. Int. X-rd |
| Coordinates | 37.34128, -113.27516 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Frame |
| Total Length | 40.0 ft (12.2 m) |
| Max Span | 35.1 ft (10.7 m) |
| Deck Width | 62.7 ft (19.1 m) |
| Deck Area | 233.0 sq m |
| Main Spans | 1 |
| Year Built | 1959 (reconstructed 2013) |
Traffic
| Avg Daily Traffic | 22,810 (2014) |
| Truck Traffic | 42% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 125 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1D 628 |