I-15 (sr-15) Nbl over Sr-133 Intchg. X-road
Fair Condition54 years old16,820 vehicles/day
Location
| State | Utah |
| County | Millard |
| Location | Meadow Interchange |
| Carries | I-15 (sr-15) Nbl |
| Crosses | Sr-133 Intchg. X-road |
| Coordinates | 38.89330, -112.41188 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 182.7 ft (55.7 m) |
| Max Span | 86.0 ft (26.2 m) |
| Deck Width | 44.0 ft (13.4 m) |
| Deck Area | 746.4 sq m |
| Main Spans | 3 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 16,820 (2017) |
| Truck Traffic | 32% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 223 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1F 259 |