I-15 (sr-15) Nbl over Sr-30
Fair Condition37 years old13,856 vehicles/day
Location
| State | Utah |
| County | Box Elder |
| Location | Riverside Interchange |
| Carries | I-15 (sr-15) Nbl |
| Crosses | Sr-30 |
| Coordinates | 41.78444, -112.17250 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 109.6 ft (33.4 m) |
| Max Span | 107.0 ft (32.6 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 450.9 sq m |
| Main Spans | 1 |
| Year Built | 1989 |
Traffic
| Avg Daily Traffic | 13,856 (2022) |
| Truck Traffic | 43% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 423 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1F 479 |