I-84 (sr-84) Ebl over I-80 (sr-80) Ebl & W
Fair Condition56 years old8,505 vehicles/day
Location
| State | Utah |
| County | Summit |
| Location | Echo Interchange |
| Carries | I-84 (sr-84) Ebl |
| Crosses | I-80 (sr-80) Ebl & W |
| Coordinates | 40.97026, -111.43929 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 290.7 ft (88.6 m) |
| Max Span | 95.5 ft (29.1 m) |
| Deck Width | 41.3 ft (12.6 m) |
| Deck Area | 1116.4 sq m |
| Main Spans | 4 |
| Year Built | 1970 |
Traffic
| Avg Daily Traffic | 8,505 (2014) |
| Truck Traffic | 37% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2C 475 |