I-215 (sr-215) Ebl over Jordan River
Fair Condition55 years old102,805 vehicles/day
Location
| State | Utah |
| County | Salt Lake |
| Location | 1100 West 6200 So. Sl Co. |
| Carries | I-215 (sr-215) Ebl |
| Crosses | Jordan River |
| Coordinates | 40.63863, -111.92226 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 129.9 ft (39.6 m) |
| Max Span | 62.0 ft (18.9 m) |
| Deck Width | 79.1 ft (24.1 m) |
| Deck Area | 954.4 sq m |
| Main Spans | 2 |
| Year Built | 1971 (reconstructed 2003) |
Traffic
| Avg Daily Traffic | 102,805 (2014) |
| Truck Traffic | 21% |
| Lanes On Bridge | 4 |
Inspection & Ownership
| Last Inspection | October 2024 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 133 |