I-70 (sr-70) Ebl over Co.rd.east Of Cisco
Fair Condition55 years old8,971 vehicles/day
Location
| State | Utah |
| County | Grand |
| Location | East Cisco Interchange |
| Carries | I-70 (sr-70) Ebl |
| Crosses | Co.rd.east Of Cisco |
| Coordinates | 39.03707, -109.28331 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 171.9 ft (52.4 m) |
| Max Span | 80.1 ft (24.4 m) |
| Deck Width | 44.0 ft (13.4 m) |
| Deck Area | 702.2 sq m |
| Main Spans | 3 |
| Year Built | 1971 |
Traffic
| Avg Daily Traffic | 8,971 (2021) |
| Truck Traffic | 49% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 186 |