I-70 (sr-70) Ebl over Co.rd. & Thompson Wa
Fair Condition51 years old10,152 vehicles/day
Location
| State | Utah |
| County | Grand |
| Location | .6 Mi.w.of Thompson Int |
| Carries | I-70 (sr-70) Ebl |
| Crosses | Co.rd. & Thompson Wa |
| Coordinates | 38.95932, -109.73256 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 6 (Satisfactory) |
| Scour Critical | 5 — Stable for scour |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 194.2 ft (59.2 m) |
| Max Span | 95.5 ft (29.1 m) |
| Deck Width | 44.0 ft (13.4 m) |
| Deck Area | 793.3 sq m |
| Main Spans | 2 |
| Year Built | 1975 |
Traffic
| Avg Daily Traffic | 10,152 (2017) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 923 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 339 |