I-70 (sr-70) Ebl over Us-89 (sr-89)
Fair Condition50 years old7,166 vehicles/day
Location
| State | Utah |
| County | Sevier |
| Location | South Salina City Limit |
| Carries | I-70 (sr-70) Ebl |
| Crosses | Us-89 (sr-89) |
| Coordinates | 38.93365, -111.85491 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 110.2 ft (33.6 m) |
| Max Span | 104.0 ft (31.7 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 453.6 sq m |
| Main Spans | 1 |
| Year Built | 1976 |
Traffic
| Avg Daily Traffic | 7,166 (2017) |
| Truck Traffic | 36% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 367 |