I-70 (sr-70) Ebl over Saleratus Wash
Fair Condition42 years old9,579 vehicles/day
Location
| State | Utah |
| County | Emery |
| Location | Southwest Of Green River |
| Carries | I-70 (sr-70) Ebl |
| Crosses | Saleratus Wash |
| Coordinates | 38.99056, -110.17528 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 5 (Fair) |
| Channel/Waterway | 7 (Good) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Prestressed Concrete Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 209.0 ft (63.7 m) |
| Max Span | 104.7 ft (31.9 m) |
| Deck Width | 44.0 ft (13.4 m) |
| Deck Area | 853.6 sq m |
| Main Spans | 2 |
| Year Built | 1984 |
Traffic
| Avg Daily Traffic | 9,579 (2017) |
| Truck Traffic | 39% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | October 2023 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 451 |