I-80EB (sr-80) over County Road
Fair Condition20 years old13,135 vehicles/day
Location
| State | Utah |
| County | Summit |
| Location | 2 Mi. East Wanship Int. |
| Carries | I-80EB (sr-80) |
| Crosses | County Road |
| Coordinates | 40.81295, -111.40139 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 62.3 ft (19 m) |
| Max Span | 57.7 ft (17.6 m) |
| Deck Width | 44.9 ft (13.7 m) |
| Deck Area | 260.3 sq m |
| Main Spans | 1 |
| Year Built | 2006 |
Traffic
| Avg Daily Traffic | 13,135 (2014) |
| Truck Traffic | 46% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 2F 730 |