Sr-130 Sbl Only over I-15 (sr-15) Nbl & S
Fair Condition59 years old4,740 vehicles/day
Location
| State | Utah |
| County | Iron |
| Location | So Cedar City Interchange |
| Carries | Sr-130 Sbl Only |
| Crosses | I-15 (sr-15) Nbl & S |
| Coordinates | 37.65139, -113.08361 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel Continuous |
| Design | Stringer/Multi-beam |
| Total Length | 255.6 ft (77.9 m) |
| Max Span | 90.9 ft (27.7 m) |
| Deck Width | 25.6 ft (7.8 m) |
| Deck Area | 607.6 sq m |
| Main Spans | 3 |
| Year Built | 1967 |
Traffic
| Avg Daily Traffic | 4,740 (2014) |
| Truck Traffic | 12% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 323 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 3C 502 |