I-15 (sr-15) Sbl over Int. Rd. To Bloomington
Fair Condition54 years old64,119 vehicles/day
Location
| State | Utah |
| County | Washington |
| Location | Bloomington Interchange |
| Carries | I-15 (sr-15) Sbl |
| Crosses | Int. Rd. To Bloomington |
| Coordinates | 37.05999, -113.58436 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 104.3 ft (31.8 m) |
| Max Span | 102.0 ft (31.1 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 429.3 sq m |
| Main Spans | 1 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 64,119 (2023) |
| Truck Traffic | 27% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 3 |
Inspection & Ownership
| Last Inspection | 123 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 3F 291 |