WB Ramp To Sr-58 over I-80 (sr-80) Ebl & Wbl
Fair Condition56 years old950 vehicles/day
Location
| State | Utah |
| County | Tooele |
| Location | 1 Mile East Of Wendover |
| Carries | WB Ramp To Sr-58 |
| Crosses | I-80 (sr-80) Ebl & Wbl |
| Coordinates | 40.74646, -114.01709 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 5 (Fair) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Steel |
| Design | Stringer/Multi-beam |
| Total Length | 260.5 ft (79.4 m) |
| Max Span | 128.0 ft (39 m) |
| Deck Width | 29.9 ft (9.1 m) |
| Deck Area | 722.5 sq m |
| Main Spans | 2 |
| Year Built | 1970 |
Traffic
| Avg Daily Traffic | 950 (2014) |
| Truck Traffic | 20% |
| Lanes On Bridge | 1 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4C 591 |