I-70 (sr-70) Wbl over Eagle Canyon
Fair Condition36 years old3,870 vehicles/day
Location
| State | Utah |
| County | Emery |
| Location | 29 Mi.e.fremont Jct.int. |
| Carries | I-70 (sr-70) Wbl |
| Crosses | Eagle Canyon |
| Coordinates | 38.86115, -110.86538 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Steel Continuous |
| Design | Arch - Deck |
| Total Length | 522.6 ft (159.3 m) |
| Max Span | 428.1 ft (130.5 m) |
| Deck Width | 45.3 ft (13.8 m) |
| Deck Area | 2198.3 sq m |
| Main Spans | 1 |
| Year Built | 1990 |
Traffic
| Avg Daily Traffic | 3,870 (2014) |
| Truck Traffic | 45% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4C 755 |