I-80 (sr-80) Wbl over Sr-196
Fair Condition54 years old8,060 vehicles/day
Location
| State | Utah |
| County | Tooele |
| Location | Rowley Interchange |
| Carries | I-80 (sr-80) Wbl |
| Crosses | Sr-196 |
| Coordinates | 40.74614, -112.65254 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 6 (Satisfactory) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 123.4 ft (37.6 m) |
| Max Span | 54.1 ft (16.5 m) |
| Deck Width | 44.0 ft (13.4 m) |
| Deck Area | 503.8 sq m |
| Main Spans | 3 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 8,060 (2014) |
| Truck Traffic | 31% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 924 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4F 214 |