I-70 (sr-70) Wbl over County Road (int.x-road)
Fair Condition53 years old6,239 vehicles/day
Location
| State | Utah |
| County | Sevier |
| Location | Spring Canyon Interchange |
| Carries | I-70 (sr-70) Wbl |
| Crosses | County Road (int.x-road) |
| Coordinates | 38.87870, -111.56444 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 5 (Fair) |
| Superstructure | 7 (Good) |
| Substructure | 6 (Satisfactory) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 93.2 ft (28.4 m) |
| Max Span | 87.9 ft (26.8 m) |
| Deck Width | 44.3 ft (13.5 m) |
| Deck Area | 383.4 sq m |
| Main Spans | 1 |
| Year Built | 1973 |
Traffic
| Avg Daily Traffic | 6,239 (2023) |
| Truck Traffic | 43% |
| Lanes On Bridge | 2 |
| Lanes Under Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 4F 222 |