County Road over Weber River Overflow Ch.
Fair Condition7 years old252 vehicles/day
Location
| State | Utah |
| County | Summit |
| Location | 2 Miles South Of Peoa |
| Carries | County Road |
| Crosses | Weber River Overflow Ch. |
| Coordinates | 40.70317, -111.32161 |
Condition Ratings
| Overall Condition | Fair |
| Channel/Waterway | 8 (Very Good) |
| Culvert | 6 (Satisfactory) |
| Scour Critical | 7 — Countermeasures installed |
Physical Characteristics
| Material | Concrete |
| Design | Culvert |
| Total Length | 32.8 ft (10 m) |
| Max Span | 30.8 ft (9.4 m) |
| Deck Width | 30.2 ft (9.2 m) |
| Deck Area | 92 sq m |
| Main Spans | 1 |
| Year Built | 2019 |
Traffic
| Avg Daily Traffic | 252 (2010) |
| Truck Traffic | 50% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 624 |
| Inspection Frequency | Every 24 months |
| Owner | County Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 043060E |