Sr-85 (mvc) NB over Sr-201
Good Condition5 years old11,420 vehicles/day
Location
| State | Utah |
| County | Salt Lake |
| Location | Sr-85 (mvc) Over Sr-201 |
| Carries | Sr-85 (mvc) NB |
| Crosses | Sr-201 |
| Coordinates | 40.72555, -112.02899 |
Condition Ratings
| Overall Condition | Good |
| Deck | 7 (Good) |
| Superstructure | 8 (Very Good) |
| Substructure | 7 (Good) |
| Scour Critical | Not applicable |
Physical Characteristics
| Material | Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 219.2 ft (66.8 m) |
| Max Span | 129.3 ft (39.4 m) |
| Deck Width | 78.7 ft (24 m) |
| Deck Area | 1603.2 sq m |
| Main Spans | 2 |
| Year Built | 2021 |
Traffic
| Avg Daily Traffic | 11,420 (2023) |
| Truck Traffic | 16% |
| Lanes On Bridge | 3 |
| Lanes Under Bridge | 4 |
Inspection & Ownership
| Last Inspection | November 2022 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 1F 916 |