IRR BIA RTE 140 over Toppenish Creek
Fair Condition40 years old400 vehicles/day
Location
| State | Washington |
| County | Yakima |
| Location | 1.6km South Of White Swan |
| Carries | IRR BIA RTE 140 |
| Crosses | Toppenish Creek |
| Coordinates | 46.33414, -120.73283 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 7 (Good) |
| Superstructure | 5 (Fair) |
| Substructure | 7 (Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Box Beam - Multiple |
| Total Length | 82.0 ft (25 m) |
| Max Span | 40.0 ft (12.2 m) |
| Deck Width | 34.4 ft (10.5 m) |
| Deck Area | 262.5 sq m |
| Main Spans | 2 |
| Year Built | 1986 |
Traffic
| Avg Daily Traffic | 400 (2023) |
| Truck Traffic | 25% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 623 |
| Inspection Frequency | Every 24 months |
| Owner | Bureau of Indian Affairs |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 00000000000P116 |