SR 530 over Squire Creek
Fair Condition54 years old3,349 vehicles/day
Location
| State | Washington |
| County | Snohomish |
| Location | 24.2 E Jct SR 9 |
| Carries | SR 530 |
| Crosses | Squire Creek |
| Coordinates | 48.27000, -121.67142 |
Condition Ratings
| Overall Condition | Fair |
| Deck | 6 (Satisfactory) |
| Superstructure | 7 (Good) |
| Substructure | 8 (Very Good) |
| Channel/Waterway | 8 (Very Good) |
| Scour Critical | 8 — Stable, low risk |
Physical Characteristics
| Material | Prestressed Concrete |
| Design | Stringer/Multi-beam |
| Total Length | 112.9 ft (34.4 m) |
| Max Span | 107.9 ft (32.9 m) |
| Deck Width | 37.7 ft (11.5 m) |
| Deck Area | 395.6 sq m |
| Main Spans | 1 |
| Year Built | 1972 |
Traffic
| Avg Daily Traffic | 3,349 (2023) |
| Truck Traffic | 14% |
| Lanes On Bridge | 2 |
Inspection & Ownership
| Last Inspection | 824 |
| Inspection Frequency | Every 24 months |
| Owner | State Highway Agency |
| Historical Significance | Bridge is not eligible for the National Register |
| Structure Number | 0009423A0000000 |